T-03.02 Structural Concrete Package 2- Rat Slab, L4 Metal Deck Slab, Tunnel H with Connection, Building 661 Thrust Walls, Transformer Pad SOG
WW-647R Biosolids Digester Facilities Project
PROJECT #
22707
PrOJECT ADDRESS
1800/1801 Jerrold Ave, San Francisco, CA 94124
ESTIMATED START - END DATE
August 2022 - August 2024
OWNER
San Francisco Public Utilities Commission
Total CONTRACT VALUE
2,883,344.00
PRIME CONTRACTOR
MWH/Webcor JV

This work will be performed at the Southeast Treatment Plant. This is an operating wastewater plant with extensive above- and below-grade infrastructure that must remain in continuous operation at all times.

A brief description of the work :
T-03.02 - Structural Concrete Package 2 B600 with Steel
Scope of Work shall provide all transportation, appliances, tools, supervision, and services; including formwork, pumping, placing, finishing, reinforcing steel, structural steel, waterstop, and ready-mix material necessary to perform the scope of work to fully complete the structure and associated miscellaneous and ancillary items necessary to provide the complete scope in accordance with the contract documents.

–––––––––––––––––––––––––––––––

Furnish and install structural reinforced concrete and steel structure for Facility 600 and Tunnel H. F
Facility 600 is a 5-storey structure including basement with deep sump pit, elevator column and concrete stairwells (approx. 100,000 sq ft).
Marinship crews are providing form carpentry labor for Building 600. Forming and pouring transformer pads. Placing 4 level roof concrete deck.
Placing 4 cast in place walls around mechanical piping in 661 Tunnel.

Return to All Projects

Related Projects

Project

Central Equipment and Maintenance Facility Improvements

Project

SEWPCP New Headworks Facility Construction of Scope 1-200 & 1-300

Project

Marin and Napoleon Bridge Replacement Project